Then you might want to read the Environment Agency’s Position Statement 085 which sets out the requirements where an environmental permit or variation to a permit, in relation to a waste operation for the use (a recovery operation) and associated storage of tyre bales for civil engineering and landfill infrastructure works, will not be required